WindSpeed : < 42m/s
Snowload : 1 4KN/m2
standard: AS1170.2
Degree: 0*-70
Arangement: Vertical
Warranty: 10 years
1 Install pile frst and then install column upon pile. And then, istall main beam and diagonal I brace on this column.
2 Install mounting rail upon mainbeam
3 tallPrl panels bv mid demp and end clamps.
Two rows panels with vertical, this is normal type solar mounting system for ground.
Ground screw 2 rows panels with vertical solar mounting system
Specification:
Wind Speed : < 42m/s
Snow load : 1 .4 KN/m2
Standard : AS1170.2
Degree: 0-70
Arrangement : Vertical
Warranty: 10years
Installation Manual:
1.Install Piles first, and then install column upon pile. And then install main beam and diagonal brace. Diagonal brace from rear post to main beam.
2.Install mounting rail upon main beam
3.Install PV panels by mid clamp and end clamps.
Main parts shown as bellow
Ground screw 3 rows with landscape solar mounting system
According to actual factors and requirements, sometimes 3 panels with landscape type will be used.
Specification:
Wind Speed :< 42m/s Snow load :1.4 KN/m2 Standard :AS1170.2
Degree :0°-70 Arrangement :Horizontal Warranty:10 years
Installation Manual:
1.Install Piles first, and then install column upon pile. And then install main beam(horizontal) and back support on 2 rear columns. Here Diagonal brace will be connected from rear post to front post. 2.Install mounting rail upon main beam. 3.Install PV panels by mid clamp and end clamps.
Main parts shown as bellow
Ground screw 4 rows with landscape solar mounting system
This 4 panels with landscape will be used usually on open filed and big power station.
Specification:Wind Speed :< 42m/s Degree :0°-70 | Snow load :1.4 KN/m2Arrangement: Horizontal | Standard :AS1170.2Warranty:10 years |
Installation Manual:
]1.Install Piles first, and then install posts upon pile. Install main beam and diagonal brace. Here Diagonal brace will be connected from rear post to main beam. 2.Install mounting rail upon main beam, here notice there are 5 mounting rails. 3.Install PV panels by mid clamp and end clamps. |
Main parts shown as bellow
Ground screw 4-5 rows with vertical solar mounting system
Chasun Solar also provide aluminum alloy structure 4-5 rows of panels with landscape array.
Specification:
Wind Speed :< 42m/s Degree :0°-70 |
Snow load :1.4 KN/m2
Arrangement: Horizontal |
Standard :AS1170.2
Warranty:10 years |
Installation Manual:
1.Install Piles first, and then install column upon pile. And then install main beam, and then install secondary beam with landscape. 2.Install mounting rail upon secondary beam. 3.Install PV panels by mid clamp and end clamps. |
Main parts shown as bellow
E-pile solar mounting system with 2 rows
This type of solar mounting system usually used for Europe market big power station. Easy to install and save labor cost.
Specification:Wind Speed :< 42m/s Degree :0°-70 | Snow load :1.4 KN/m2Arrangement :Vertical | Standard :AS1170.2Warranty:10 years |
Installation Manual:Installation Manual:1.Install Pile first, And then install main beam and diagonal brace on this column.
2.Install mounting rail upon main beam 3.Install PV panels by mid clamp and end clamps 4.Here for pile, we can use “∑ ”or “几”type |
Main parts shown as bellow
Concrete pile solar mounting system
This type solar mounting system mainly use for some area which is hard to use normal pile or concrete foundation as base.
Also its structure usually used for lake or low-lever ground area.
Specification:
Wind Speed : < 42m/s
Snow load: 1.4 KN/m2
Standard: AS1170.2
Degree: 0°-70
Arrangement : Vertical
Warranty: 10 years
Installation Manual:
1 Install Concrete and Pile frst, make concrete pile and take steel pile in it. and then install column upon pile. And then install main beam and diagonal braces on thiscolumn.
2.Install mounting rail upon main beam
3.Install PV panels by mid clamp and end clamps.
Main parts shown as bellow